Project Location: Rome, GA
Initial Bid Amount: $1,636,000
Description: Contractor added/removed 2,000 cyds of embankment in front of 80 foot high dam after draining approximately 3/4 of a billion gallons via a siphon system in preparation for improvements to a 90 year old reservoir, which is located in the remote part of the Berry College campus. Work included removal and replacement of lead jointed 12" pipe in 330 foot long tunnel under dam and 75 vertical feet of tower intake piping. A new pipe tunnel and overflow discharge channel was completed at the lower part of the dam. This work was to bring the existing dam into a Category I Safe Dams rating.