Project Location: Clayton County, GA
Initial Bid Amount: $12,049,179
Description: Improvements to the existing WWTP during ongoing operations with 60,000 cy excavation and backfill, 54" HPDE Pipeline, 5000 cy structural concrete, rehab existing headworks structure including re-coating/repair damaged concrete, drum screen structure/equipment, shoring, chemical tanks and chemical lines, 120 foot diameter concrete tank, 48" & 36" hot taps, electrical and instrumentation.